China CT Steel Structure Group Co., Ltd.

Steel Structures to Help the World become a better place

Manufacturer from China
Verified Supplier
1 Years
Home / Products / Steel Structure Warehouse /

Space Frame Steel Structure H Beam Building Construction Warehouse

Contact Now
China CT Steel Structure Group Co., Ltd.
Visit Website
City:weifang
Province/State:shandong
Country/Region:china
Contact Person:MrGao
Contact Now

Space Frame Steel Structure H Beam Building Construction Warehouse

Ask Latest Price
Video Channel
Brand Name :CT Steel Structure
Model Number :Warehouse 86602
Certification :SGS
Place of Origin :China
MOQ :200 square meters
Price :$300 per square meter
Payment Terms :L/C,D/A,D/P,T/T,Western Union,MoneyGram
Supply Ability :200, 000 Tons / Year
Delivery Time :5-6weeks
Packaging Details :Single package size: 1100 × 200 × 200 cm
Name :Steel Structure H Beam Building Construction
Toughness :Good Toughness
Industrialization :High Degree of Industrialization
Period :The Construction Period Is Short
Weight :Light Weight
Intensity :High Intensity
Stiffness :The Overall Stiffness Is Good
Cost advantage :Maintenance costs
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Custom designed high quality H-beam steel structure building materials metal warehouse

The steel structure warehouse uses high-strength steel as the main structure, which is much stronger than ordinary building materials, can withstand large loads, build large-span space, and does not need too many support columns inside, which greatly improves the space utilization. The steel's good toughness makes it not easy to fracture brittlely in extreme weather, ensuring warehouse safety. The prefabricated components of the factory use advanced equipment to ensure the processing accuracy, the on-site installation is fast, and the construction period is greatly shortened. The galvanized and coated steel effectively resists erosion, and the fire rating is improved with non-combustible insulation materials such as rock wool, and the steel can be 100% recycled, which is environmentally friendly and energy-saving.

​​​


Product name
 

Steel structure workshop
 
Length H beam 4000-15000mm
Height 200-1200mm
color According to customers
Base Cement and steel fouddation bolts
Main frame H beam
Roof purlin Q235B C/Z section galvanized steel
Wall purlin Q235B C/Z section galvanized steel
Bolt Plain bolt ang high-strenth bolt
Door Sliding or rolling door
Customized design is welcomed.
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly.
Space Frame Steel Structure H Beam Building Construction WarehouseSpace Frame Steel Structure H Beam Building Construction WarehouseSpace Frame Steel Structure H Beam Building Construction WarehouseSpace Frame Steel Structure H Beam Building Construction Warehouse

Package Size 100.00cm * 100.00cm * 100.00cm
Package Gross Weight 100.000kg
Space Frame Steel Structure H Beam Building Construction WarehouseSpace Frame Steel Structure H Beam Building Construction WarehouseSpace Frame Steel Structure H Beam Building Construction WarehouseSpace Frame Steel Structure H Beam Building Construction Warehouse

Product Description:

Excellent strength: The steel selected has extremely high strength, which can withstand greater weight and load than traditional building materials, and can easily build a large-span space without too many internal support columns, greatly improving the space utilization rate of the warehouse and facilitating the storage and handling of large goods.
Excellent toughness: Steel has good toughness, and in the event of extreme natural disasters such as earthquakes and strong winds, it can absorb energy through its own deformation, effectively avoid brittle fractures, ensure the safety of warehouse structures, and reduce the risk of cargo loss.
Convenient processing: The steel is easy to be machined, and can be accurately cut, drilled and welded with the help of advanced equipment, and can quickly produce components with accurate dimensions and different shapes according to the design requirements of the warehouse, which is convenient for subsequent on-site assembly.
Efficient construction: The production method of prefabricated components in the factory, combined with the simple and fast installation process on site, greatly shortens the construction period, allows the warehouse to be put into use faster, reduces the cost of construction time, and creates economic benefits as soon as possible.

Flexible customization: Through welding and other processes, steel can be combined into various shapes and specifications on demand, whether it is a conventional rectangular warehouse or a warehouse with special modeling needs, it can meet the design requirements and adapt to different sites and use needs.
Good fire performance: the use of non-combustible insulation materials such as rock wool and steel after fire protection treatment significantly improves the fire rating of the warehouse, effectively reduces the spread speed of fire, buys time for fire rescue, and protects the safety of goods.
Strong corrosion resistance: The surface of the steel is treated with galvanizing, aluminum-zinc plating, coating and other treatments to form a dense protective film, which can effectively resist corrosive environments such as humidity, acid and alkali, and can maintain stable structural performance for a long time even under harsh storage conditions.
Superior seismic performance: the steel structure itself is light in weight and good ductility, which can effectively reduce the seismic force under the action of earthquake, and the structural deformation ability is strong, and it has higher safety and stability in the earthquake than other structural forms of warehouses.
Low maintenance cost: Due to the durability and good corrosion resistance of steel, the steel structure warehouse only needs to carry out simple maintenance on a daily basis, and there is no need for frequent repair and replacement of components, which reduces long-term maintenance costs and improves the use efficiency.

Why Choose Us

Professional team: We have a professional design team composed of senior structural engineers, architectural designers, etc. They have solid professional knowledge and rich practical experience, and can deeply understand the diverse needs of customers, whether it is a conventional industrial plant or a unique commercial building, they can accurately grasp the key points of design. In the early stages of the design process, the team will fully communicate with the client to understand the functional positioning, spatial layout requirements, budget constraints and expected service life of the project in detail, so as to lay a solid foundation for the subsequent design work.

Process quality control: In the process of steel structure processing and production, multiple quality control points are set up. For example, real-time monitoring of key processes such as cutting, drilling, and welding of steel is carried out, and operations are carried out in strict accordance with process standards. Non-destructive testing technology, such as ultrasonic flaw detection, magnetic particle flaw detection, etc., is used to inspect the quality of welded joints to ensure that the welding quality meets the requirements of the design grade. Each completed process, the quality inspection is carried out, and only after passing can the next process be entered to avoid the flow of unqualified products into the next link.

Transportation plan planning: according to the size, weight, quantity of the steel structure, the geographical location of the project site, traffic conditions and other factors, formulate a reasonable transportation plan. Choose the right transport vehicles, such as flatbed trucks, low-bed semi-trailers, etc., to ensure that the goods can be loaded and transported safely and stably.

Choosing our steel structure storage products is to choose professionalism, quality, efficiency and value. We look forward to working with you to create exceptional construction projects.

Space Frame Steel Structure H Beam Building Construction Warehouse

Space Frame Steel Structure H Beam Building Construction Warehouse

Space Frame Steel Structure H Beam Building Construction Warehouse

Company Profile

Shandong Chentai Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.

Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.

Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.

Container loading; We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.

"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!

Space Frame Steel Structure H Beam Building Construction Warehouse

Packaging & Shipping

1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box

Space Frame Steel Structure H Beam Building Construction Warehouse

FAQ

Space Frame Steel Structure H Beam Building Construction Warehouse

Inquiry Cart 0