
Add to Cart
Industrial Steel Frame Building Prefabricated Steel Structure Factory Workshop Materials
The steel structure factory has significant advantages, its components are prefabricated in the factory, assembled on site, and the construction period is shortened by about 1/3 compared with the traditional concrete structure, which can allow the enterprise to put into production quickly. It makes efficient use of space and can realize a large span of column-free space, which is convenient for equipment placement and material transportation. The steel has high strength, light weight, reduced foundation cost and good seismic resistance, and the recycling rate of components exceeds 90% after the expiration of use, which is green and environmentally friendly. The construction is not subject to excessive climate constraints, the design is flexible and diverse, can meet various needs, daily maintenance is also simple, and the long-term maintenance cost is low.
Product name | Steel structure factory |
Length | H beam 4000-15000mm |
Height | 200-1200mm |
Galvanizing Thickness | 40 - 100 μm, etc. for Selection. |
Main frame | H beam |
Base | Cement and steel fouddation bolts |
Specification | Custom |
Bolt | Plain bolt ang high-strenth bolt |
Roof&wall | Sandwich panel or color plate |
Door | Sliding or rolling door |
Transport Package | Seaworthy Package |
Trademark | Qianfeng Chentai Steel Structure |
Customized design is welcomed. | |
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly. | |
Building Purpose: we will recommend the best design for the purpose of the building | |
A.Warehouse/Storage | |
B.Industrial workshops | |
C.Processing plants | |
D.Greenhouse structure for breeding | |
E.Medical Warehouse | |
F.Office buildings | |
G.Agriculture Barn |
Package Size | 100.00cm * 100.00cm * 100.00cm |
Package Gross Weight | 100.000kg |
Steel structure factory building
Experience the convenience and efficiency of our steel structure factory building. Due to the short construction time and high efficiency, this building is perfect for those who value speed and productivity. All steel components are prefabricated on our factory floor, allowing for quick assembly on site. This means you can get your building up and running in no time, maximizing your benefits.
Rest assured that our buildings are safe, secure, and unbreakable. It is made of high-quality steel with exceptional strength and is designed to withstand harsh environments such as typhoon zones and earthquake zones. We integrate the rational design of the building structure to ensure maximum protection against damage.
Our steel frame factory buildings offer a wide range of applications. Ready-made structural sections can be shaped and covered with any type of material, making them suitable for industrial, commercial, civil construction, and various public facilities.
Our buildings are not only efficient and versatile, but also environmentally recyclable, and all the steel used is environmentally friendly and does not cause harm to the natural environment.
Choose steel structure buildings from China CT Steel Structure Group Co., Ltd. to provide reliable, efficient and environmentally friendly solutions for your construction needs.
Why Choose Us
Professional team: We have a professional design team composed of senior structural engineers, architectural designers, etc. They have solid professional knowledge and rich practical experience, and can deeply understand the diverse needs of customers, whether it is a conventional industrial plant or a unique commercial building, they can accurately grasp the key points of design. In the early stages of the design process, the team will fully communicate with the client to understand the functional positioning, spatial layout requirements, budget constraints and expected service life of the project in detail, so as to lay a solid foundation for the subsequent design work.
Process quality control: In the process of steel structure processing and production, multiple quality control points are set up. For example, real-time monitoring of key processes such as cutting, drilling, and welding of steel is carried out, and operations are carried out in strict accordance with process standards. Non-destructive testing technology, such as ultrasonic flaw detection, magnetic particle flaw detection, etc., is used to inspect the quality of welded joints to ensure that the welding quality meets the requirements of the design grade. Each completed process, the quality inspection is carried out, and only after passing can the next process be entered to avoid the flow of unqualified products into the next link.
Transportation plan planning: according to the size, weight, quantity of the steel structure, the geographical location of the project site, traffic conditions and other factors, formulate a reasonable transportation plan. Choose the right transport vehicles, such as flatbed trucks, low-bed semi-trailers, etc., to ensure that the goods can be loaded and transported safely and stably.
Choosing our steel structure storage products is to choose professionalism, quality, efficiency and value. We look forward to working with you to create exceptional construction projects.
Company Profile
China CT Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.
Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.
Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.
Container loading; We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.
"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!
Packaging & Shipping
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box
FAQ